Earthworks and construction activity at Ashaiman along the Section 1 corridor
Accra–Tema Motorway and Extensions Project

A.T. Expressway Ltd.

Your special purpose vehicle for the design, finance, and operation of the 27.7 km corridor length, including the 19.5 km Section 1 currently under construction.

27.7km
Corridor length
19.5km
Section 1 under construction
52%
Physical progress for Section 1
01 — The project

A 27.7km development. Three sections under construction

The Accra–Tema Motorway and Extensions Project reconstructs and expands a critical corridor in Ghana’s national road network.

02 — About us

Ghana’s first toll road public–private partnership

About ATEL

The Accra–Tema Motorway dual carriageway links Accra and the industrial city of Tema, where Ghana’s main port is located. It was opened as a freeway in 1964 under Ghana’s first president, Kwame Nkrumah. The design life of the motorway was intended for 20 years, and the pavement has outlived its terminal level of serviceability with visible fatigue-cracking, joint failures and pumping under wheel load — and requires reconstruction.

03 — The journey

From award to completion, on a fixed project

Earthworks and construction activity at Ashaiman along the Section 1 corridor
Construction under way across the Section 1 corridor.
  1. 12 March 2024

    Concession signed

    The 30-year concession agreement was awarded to begin the delivery of the project

  2. 2 August 2024

    EPC Commences

    The 36-month construction window begins on Section 1.

  3. August 2026 · current

    52% complete

    Latest reported physical progress across the Section 1 corridor.

  4. 2 August 2027

    Scheduled completion

    Target completion of the Section 1 reconstruction works.

04 — By the numbers

The scale of the works

The 19.5 km Accra–Tema Motorway — Phase 1, currently under construction and the focus of monthly progress reporting.

19.5km
Length
10
Lanes on completion
US$338.9M
Construction Contract Price
1,095days
Contract duration
4
Interchanges
10
Pedestrian crossings
755days
Project days elapsed
284
Equipment recorded on site
05 — Progress

Interchange construction, structure by structure

Tetteh Quarshie Interchange70%
approx. CH 0+500 · T-beam installation and joint concreting works
Teshie Link Interchange70%
approx. CH 6+300 · Traffic-diversion wall construction
Community 18 Interchange70%
approx. CH 12+350 · Underpass construction
Lashibi Interchange40%
approx. CH 16+200 · Top-slab structural works

Interchange progress figures reflect the client corrections, 14 and 20 September 2026.

06 — Design

A ten-lane corridor, built in two surfaces

The rebuilt corridor carries 10 lanes in total: 4 lanes of reinforced concrete freeway alongside 6 lanes of urban highway. The cross-section and interchanges are set out in full on the design page.

Typical road cross-section drawing showing the divided carriageways, central reservation and pavement layers
Typical road cross-sectionDrawing
Proposed design of the Tetteh Quarshie Interchange
Tetteh Quarshie Interchange — proposed designDesign
07 — Gallery

The works in pictures

View the gallery
Earthworks and construction activity at Ashaiman along the Section 1 corridor
Section 1 corridor under constructionConstruction
Underpass construction at Community 18 Interchange, Km 12+350, showing the completed reinforced-concrete box on both sides of the corridor
Community 18 Interchange — underpass completeConstruction
Construction of traffic-diversion walls on the left-hand side at Teshie Link Interchange, Km 6+363, with traffic passing between Accra and Tema
Teshie Link Interchange — diversion wallsConstruction
Precast T-beams for bridge deck construction on the corridor
Precast T-beams for the bridge decksConstruction
08 — Delivery

An accountable delivery chain

All stakeholders
Contracting Authority

Ministry of Roads & Highways (opens in a new tab)

Government of Ghana contracting the Ghana Highway Authority through the Ministry of Roads & Highways.

Coat of arms of the Republic of Ghana
Ghana Highway Authority logo
Ministry of Roads and Highways, Republic of Ghana, logo

Follow the Accra–Tema Motorway and Extensions Project as it takes shape.

Explore the design, track verified construction progress, and see the works in pictures.